![]() ![]() 3 E.coli/100 mL Center Lake 4 E.coli/100 mL Camp Lake 387 E.coli/100 mL Hooker Lake Boat Launch 21 E.coli/100 mL Rock Lake 79 E.coli/100mL. Salem Lakes – Silver Lake County Park beach 37 E.coli/100 mL Silver Lake DeWitt Park >2419 E.coli/100mL Lake Shangri-la 220th Ct. Other test results from Monday reported by Kenosha County Public Health (except where noted) are: DeWitt Park and Camp Lake were scheduled to be resampled Tuesday.The results from Monday that prompted the closure and caution were: The State Department of Health recommends posting warnings at beaches when test results indicate a E.coli level of 235/100mL or more and closing a beach when test results exceed E.coli 1000/100mL. Please refer to the WI 511.gov project website for additional information, and feel free to reach out with any questions.ĭeWitt Park Beach on Silver Lake is closed to swimming and Camp Lake is under a swim caution after testing by Kenosha County Public Health on Monday showed elevated levels of E.coli in those locations. Full Access will be maintained at the intersection with STH 83.Thurs 8/3 – Sat 8/5: Rolling closures of remaining side streets (246 th St, 243 rd St, and 239 th Street) for 2-3 hour periods.Wed 8/2 Afternoon: Closure of 248 th Street access onto STH 50 from approximately 2:00 – 4:30 PM.Wed 8/2 Morning: Closure of 250 th Street access onto STH 50 from approximately 7:00 – 10:00 AM.Wed 8/2 – Sat 8/5 there will be Temporary Rolling Closures of side street access for grading.Any short-term temporary closures will be discussed with the owners.Īs a reminder, the project team recommends traveling at 25 mph through the work zone for driver and work zone crew safety and to avoid vehicle damage. Access to all businesses on the north side of the street will be maintained. A single lane of traffic in each direction will be maintained on the newly paved eastbound lanes on the south side of 75 th Street. Stage 4 is a long-term stage involving repaving the westbound lanes on the north side of 75 th Street. Stage 4 Construction Work & Traffic Configuration is fully underway. We will share what is made available to us by project engineer GRAEF, the state and village, and hope to have periodic updates with reports on what work has taken place and what is expected for the coming week. Note: will be reporting regular updates on the construction work on Highway 50 in Paddock Lake this spring, summer and fall. This year’s Kenosha County Fair runs from Aug. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |